J Sparks Electrical Contractor

Main Street

Newtown


 

Health and Safety

Project Overview

 


 

Unit 24

The Elms Industrial Unit

Corby

 

 


Page 2 of 3

Project Information Sheet

 

Scope of work to be carried out

Small power installation
Office lighting
Factory high level lighting
Busbar trunking system
Emergency lighting system

Fire alarm system

Site personnel details:

Project manager: David Brown         Tel Office 01455 4578963                     Fax 01455 587963
Site supervisor: Jim Cary                 Tel Site 0115 547896                           Fax 0115 455568

Site accommodation:

1-Office size 4mx5m
1- Storage container 4mx3m

Vehicles and plant:

3-Small vans
1-Mobile elevating platform

Hazardous substances:

LPG

Hazardous areas or situations:

High level working

 
Health and safety overview

Produced by: (block capitals)……………………

Signature………………….

 

Date produced………………..


Page 3 of 3


Risk Assessment and Risk Assessment Overview

The subject column enables the contractor to
itemise the main headings of the site work.

Specific Risk Assessments can then be selected
from the software and attached to the form.

Click the blue Risk Assessments to see examples

Risk Assessment and Risk Assessment Overview

Subject

Specific Risk Assessments

Site accommodation

 

 

Site offices

 

 

Site vehicles

 

 

Company vehicles on site

 

 

First fix

 

 

Site electrical supplies

 

Chasing machine

 

Ladders

 

Trunking and tray

 

Mobile elevating platform

 

 

Second fix

 

 

Ladders

 

Mobile elevating platform

 

Cable pulling

 

Installation of lamps and tubes

 

 

Testing

 

 

Testing and commissioning

 

 

 

 

 

 

  
  
  

 