Return to Main Menu


Cable Pulling (IM2)


Hazards

Risk Rating

Injury to personnel High
Damage to cables High
  
  


Planned Methods To Reduce Risks

  • All staff will wear personal protective equipment

  • Adequate rollers etc will be provided to make for easy cable pulling, and to ensure no damage is caused to the cable.

  • The electrical contractor shall ensure compliance with all current legislation and codes of practice with respect to cable installation.

  • The proposed cable route shall be surveyed before any work commences, to establish the labour force required and to identify site hazards.











 Return to Main Menu