| Site Materials (HS8)
Hazards | Risk Rating | | Injury due to lifting | High | | Cuts due to handling sharp objects | High | | Personnel falling over loose material | Medium | | | | | | |
Planned Methods To Reduce Risks
All materials held on site will be in stored in suitable, clearly marked containers or skips etc.
The storage area is to be sited as close as practicable to the working area of use, in order to minimise the extent of manual handling.
Suitable personal protective equipment will be provided to staff handling waste materials.
Training will be given to staff on the lifting and handling of heavy objects.
|