Return to Main Menu


Site Materials (HS8)

Hazards

Risk Rating

Injury due to liftingHigh
Cuts due to handling sharp objectsHigh
Personnel falling over loose materialMedium
  
   


Planned Methods To Reduce Risks

  • All materials held on site will be in stored in suitable, clearly marked containers or skips etc.

  • The storage area is to be sited as close as practicable to the working area of use, in order to minimise the extent of manual handling.

  • Suitable personal protective equipment will be provided to staff handling waste materials.

  • Training will be given to staff on the lifting and handling of heavy objects.


 


 Return to Main Menu